Skip to content

Fire door management

From floor plan to signed-off repair.

Bring your building into 3D. Find the door, see the defect and follow the work through to completion, with the evidence attached.

  • Signed and in date
  • Defect
  • Awaiting verification
  • Urgent defect
  • Overdue or due soon
  • Not inspected, or no access
  • Needs a person
  1. 12 Oct 2025, FD-G-02: Defect raised: Closer does not latch the door from 90 degrees. Priya Nair, inspector.
  2. 4 Nov 2025, FD-G-02: Proof submitted for verification. Work done: Adjusted or replaced the closer. Dan Ellis, contractor.
  3. 10 Nov 2025, FD-G-02: Proof verified and defect closed: Re-checked on site, closes onto the latch. Priya Nair, inspector.
  4. 14 Sep 2026, FD-G-07: Inspection: not accessed; note: riser locked, key holder off site. Priya Nair, inspector.
  5. 20 Oct 2026, FD-G-05: Proof submitted for verification. Dan Ellis, contractor.
  6. 27 Oct 2026, FD-1-02: Defect raised: Fire door wedged open on an escape route. Priya Nair, inspector.

Put your building to work. Upload your floor plan. Explore it in 2D or 3D.

Doorledger: a fictional clinic's floor plan, a PDF, is added and read on the device. Every door found on the drawing becomes a pin marked To survey. View in 3D then shows the floor as a building with its doors.

The building becomes your way into the record.

Tap a door to see its details, photos, defects and outstanding work.

Doorledger on a phone: on the ground floor of Harbour House in 3D, a tap on the urgent pin for door FD-G-06 brings the view to the door and opens its record, an urgent defect held open by HO-G-02, with Book a contractor as the next step.

Already surveyed? Start ahead. Upload your existing door register.

Check each line, fix the gaps and move straight to the work.

Bringing in a door register for the fictional Quayside Clinic: a 7-line CSV read and its columns matched, then Check and correct, with 6 lines to merge, 1 that needs fixing and 0 left out, and a table of tags, floors, locations, ratings and fire door. On line 2 the plan check says Reception is not a room on this floor yet, with Add this room.

One survey. Every door assigned. Choose your contractor and deadline, and send the building's doors together.

Your contractor records the findings as they go. You see progress and review the results.

Assign survey for Harbour House: 16 of 16 doors in the survey, contractor Dan Ellis of Northgate Doorsets, due by 6 November 2026, a note that the keys for the plant room and the riser are at reception, every ground floor door ticked, and Send survey.
The contractor recording door FD-G-05 on a phone: condition Findings, leaf delaminating at the bottom rail, urgent, with Replace suggested, and one photo of the door.

Turn findings into fixes. Choose repair or replacement, then assign the work.

The original finding, the contractor's evidence and the final decision stay connected. Nothing is retyped.

The manager reviewing the survey's findings: each becomes the door's defect in the contractor's words with Repair, Replace or No action. FD-G-01 gap at the head, Repair; FD-G-04 intumescent strip missing, Repair; FD-G-05 urgent, leaf delaminating, Replace; FD-G-07 keep shut sign faded, No action. Then the two repairs are booked together.

Work submitted isn't work signed off. The firm that did the work cannot accept it.

The contractor sends the evidence. The named reviewer accepts the work or sends it back with comments.

FD-G-02
  1. Inspection

    Priya Nair

  2. Defect raised

    Priya Nair

    Closer does not latch the door from 90 degrees

  3. Work booked

    Sam Whitfield

    Job booked for 4 Nov 2025

  4. Proof sent

    Dan Ellis, Northgate Doorsets

    Adjusted or replaced the closer

  5. Verified

    Priya Nair, inspector

    Re-checked on site, closes onto the latch

    The rule: The person who did the work cannot accept their own proof.

  6. History kept

    Priya Nair

    Signed, no defect found

Open the building. See what needs doing.

Urgent defects, overdue inspections, doors not accessed and work awaiting sign-off, with who acts next and when.

The manager's Overview for Harbour House on 27 October 2026: today's counts (2 urgent with nothing booked, 4 overdue work, 1 door inspection overdue), a building survey with 2 doors to survey and an Assign survey button, then doors, compartmentation and fire systems at a glance, 6 of 16 doors signed and in date.

Your contractors may change. Your records stay.

Each door keeps its history through inspections, repairs, replacements and changes of contractor. Doorledger keeps the record. It does not certify doors.

How we keep your record secure

See it on a building like yours.

Explore the demo, then start with one building and the contractors you already use.